FACTORIES
Built a New Factory on April 2015.
To improve productivity and efficiency, we invest facilities actively.
1F
Floor area 288 ㎡ (18m x 16m), equiped inverter type hoist (2t). Utilizing height 4m ( open ceiling part for hoist is 9m ), long/large/heavy control panel can be manufactured as well.
2F
Floor area 264 ㎡ ( considering open ceiling part ), standard control panel and small joint box can be manufactured.
The Assembly Floor
In the assembly floor, wiring the power circuit and control circuit. In addition, processing of wires and connectors by soldering.
After wiring and assembly panels, to inspect them with some test energization equipments.
To improve efficiency and quality, We put enphasis on "Management of some tools", "Subdivision of the work area" and "Clean work area".